The experimental studies were carried out in a full scale advanced drinking water treatment plant treating raw water with higher concentrations of iron, manganese and organic matter with a capacity of 10? 对铁、锰含量较高又存在有机微污染的原水进行深度处理的生产规模的净水厂(规模10m3/h),进行了运行效能的试验研究。
Full Scale Tests on Uplift Capacity of Micro-piles FEASIBILITY STUDY ON FULL CAPACITY REALIZATION OF LEACHING PLANT 微型桩抗拔特性原型试验研究堆浸厂实现达产目标的可行性分析